
First Quantum Minerals
Project Overview
We were commissioned to deliver a series of high-end workplace CGI renderings for First Quantum Minerals, located within The Heals Building, London W1.
Designed by Whitepaper, this 12,500 sq. ft Cat B workplace demonstrates a refined balance between material richness, spatial clarity, and contemporary office design.
Our role was to translate the design intent into photorealistic architectural visualisation, enabling the project to be communicated clearly for presentation, stakeholder engagement, and design validation.
At Digital3DWorks, we specialise in workplace CGI in London, creating visuals that not only represent space — but convey atmosphere, usability, and identity.
Open Plan Workspace
Description:A bright and expansive open-plan office defined by clean geometry, glass partitions, and warm timber flooring. The layout promotes collaboration while maintaining visual order and rhythm.

CGI Focus:
Soft daylight behaviour across floor surfaces
Glass reflections and transparency balance
Repetition and depth in workspace layout
Subtle material contrast (fabric, timber, metal)
Reception Area
Description:A welcoming reception space anchored by a textured stone wall and integrated branding, complemented by a curved desk and warm natural light.

CGI Focus:
Natural light interaction with textured stone
Brand integration and focal hierarchy
Shadow softness and realism
Material depth (stone vs plaster vs timber)
Breakout / Kitchen Space
Description:A multifunctional breakout area combining hospitality-inspired dining with a modern office kitchen, enriched by warm tones and layered lighting.

CGI Focus:
Warm lighting temperature balance
Material richness (marble, wood, fabric)
Ceiling feature definition
Lifestyle storytelling within workplace context





